Hot sale home lighting plastic body 9W led bulb

FOB Price: Get Latest Price
Model:SG-BB-HOL09
Certification:PSE,C-Tick,ROHS,CE
Capable:TUV,SAA,UL,CB
Minimum Order:2
Brief Description:Hight quality led light bulb with 9W power .led light bulb high CRI >80, trying to restore the true color.

Nicole Sun

  • Product Details

Basic Specification

power9W
life≥ 50000 hrs
Input voltageAC85-265V
Materialled bulb:Alu.+PC Cover
Lamp BaseE26 E27 B22
Power9W
Life50000 hours
Color TonesWarm Color
Lamp HolderB22, E26, E27
IlluminantSMD
Light Source ChipEpistar
Voltage90-260V
DimmableNo
PackageYes
Power Storage or NotNo
MaterialAluminum, PC
Lamp BaseB22, E26, E27
ShapeGlobal Shape

Detail Description


1.Product Parameter

Hot sale home lighting plastic body 9W led bulb

 Item   Name

 SG-BB-HOL07

 Input   Voltage

 AC85-265V

Luminous:

720-765lm

 Lifespan

 ≥ 50000 hrs

 LED

 SMD

Beam Angle

  150°

Size

Φ60x117mm 

Color Temperature:

WW/CW/DL

Lamp Base

E26 E27 B22

Power   9W
DimmableYes

PF

0.55

MaterialLed bulb : Alu.+ PC Cover

2.Product Picture

         Hot sale home lighting plastic body 9W led bulb

                

3.Product Display

              Hot sale home lighting plastic body 9W led bulb

4.Product Applications


5.Our Factory


6.Our Certification

  •  Our products has passed ROHS, CE, PSE,C-Tick and CCC certifications.Some parts have  VDE,TUV, SAA,UL certificates,gaining high reputation at home and abroad. 

7.Factory Lighting Exhibition History


8.Quality Control

9.Company Style

                                         Our Services

  • Your inquiry related to our products or prices will be replied in 24 hours. 


  • Well-trained and experienced staffs to answer all your enquires in fluent English. 


  • OEM&ODM, any your customized lightings we can help you to design and put into product.


  • Distributorship are offered for your unique design and some our current models.


  • Protection of your sales area, ideas of design and all your private information.

10.Packaging & Shipping



11.Partners


12.Organizational Structure


13.Production Process

14.Why Choose SIGOLED

  • In 2009 Led Master and teacher Jacky Lynn set up SIGOLED.In 2014 we bought two one local led factories SIGOLED, become stronger and stronger to support you.

  • LED is new and immature technology. Our R&D Team leader is LED teacher in university guiding 4-5 graduate students each year, study the latest LED technology Founder of LED ENGINEER group with over 10,000 members

  • Thoughtful and long-sighted marketing plan, which make our products popular and competitive

  • Responsible and quick service, many customers like our strong communication skill

  • Partner cooperation- not only buy or sell, we would like to build partner cooperation with our customers, we would like to support few partner in one region or country.

15.Top Selling






16.Contact Us



17.FAQ

Q1: How you can control the quality?

A: 100% of the PRODUCTS will be tested and keep lighting to test its quality reliability , from raw

     material to half assembling until finishing products,

      Each product should pass all these QC procedures before shipping to customer

Q 2: What is your trading terms?

A: 1. Payment term: T/T 30% deposit after order confirmed, 70% balance before shipment. Or L/C, or 

      Western Union for small amount.

2. Lead time: normally in 20-25 days after deposit received, but it depend on the order quantity, also 

    the lead time will be faster

3. Sample policy: Samples are always available for each model. Samples can be ready in 7-15 days 

    once payment received.

4. Shipping port:  Guangzhou /Shenzhen China

5. Discounts: We offer discount for big quantity.

Q3: What is your client?

A: wholesaler, Export Company, hotel projects, supermarket chain, trading agent and big retail chains

Q4: what to purchase your product?

A: Quotation → PI → Confirm PI → Arrange 30% deposit →Manufacturer→QC inspect → Pay balance 

      → Shipping

Q5: How I can deliver the goods?

A: 1, By Express: such as DHL, UPS, TNT, FEDEX etc. The dispatch time is about 3-5 days

2, Air Freight: when your order more than 100kgs which will be more economical than express.

3, Sea Freight: we will update sea freight once we know your sea port where goods will be delivered.

4, Agent designated by client: please tell us the contact detail of your shipping agent and we will 

    arrange to deliver the items.

Q6: How many workers in your factory?

A:  We have around 50workers, including one LED master and LED professor in R&D team.

     You can rely on us for our sincere attitude and strong ability in led technology .

Additional Information

Payment TermsL/C, T/T, D/A, D/P, Credit Card, Western Union, Money Order, Paypal, Others
Minimum Order2
Lead Time / Delivery Time30 Day(s)
Sample AvailableYES Ask For Sample
Delivery Details7-15days after receving the payment
FOB PortXiamen,
Loading InfoBunk order by sea. Samples order by air.
Packing InfoIndependent packing
Target Market(s)North America, Oceania, Southeast Asia, Eastern Europe, Africa(except Middle East), Hong Kong/ Macao/ Taiwan, Latin America, Japan & Korea, Middle East & South Asia, Mainland China, Western & Southern Europe, Northern Europe, Central & Southern Asia, Middle East

Send your message to this manufacturer


3000
SearchPost Buying Lead